Central Heating System
Mr and Mrs Brooks wanted to modernise the existing heating system and free up some valuable space in preparation for a new bathroom to be installed.
TND Lymington carried out a system update with the IDEAL Independent C24 27KW/G
![]() |
![]() |
We removed the old boiler
![]() |
The cylinder cupboard is within the bathroom and taking up 20% of the available space.
![]() |
Removal of the cylinder and all the associated pipe work renders
![]() |
![]() |
The system update utilises main water pressure allowing the storage tanks to be removed and approximately 1 tone of water has been removed from the loft area.
![]() |
![]() |
The IDEAL Independent C24 Condensing boiler with horizontal flue providing the hating and hot water for the Brooks Family
![]() |
![]() |
![]() |
![]() |

01590 671 088
07853 409 628
















